2020年ACCA12月考季臨近,最近,會計網經常會收到同學們的反饋,稱對于Flexible Budget這個知識點存在諸多疑點。Flexible Budget一向都是ACCA考試中必考知識點之一,今天會計網針對大家問題,著重詳解下Flexible Budget這個考點內容。
一、What are fixed budget,flexible budget and flexed budget
在flexible budget中我們學了三種預算: fixed budget, flexible budget and flexed budget
Fixed budget:A fixed budget is a budget which is normally set prior to the start of an accounting period, and which is not changed in response to changes in activity or cost.
(固定預算是在生產之前就決定的,是固定數值不會隨著生產活動水平的變化而變化,適合用于planning stage,為企業未來的生產提供指引)
Flexible budgets are budgets which, by recognizing different cost behaviour patterns, change as activity levels change.
(彈性預算是將成本按照成本性態進行區分,分為變動成本,固定成本和半變動成本,會隨著生產活動水平的變化而變化)
Flexed budget: [Adjusted for actual volume](是flexible budget中特殊的一種,基于實際生產活動下的彈性預算,但是在MA中flexible budget 和flexed budget 看作一致的,也就是flexed budget 也可以表示為基于實際數量下的預算)
注:
當彈性預算是基于任意生產活動水平時,適合用于planning stage,幫助企業了解在不同情況下會消耗的資源,在生產前進行資源配置。
當彈性預算是基于實際生產活動水平時,使用于control stage:在獲得了實際結果時,如果直接那fixed budget 與實際結果進行比較意義不大,因為此時既有銷售數量的不同,又有價格的不同,所以此時用flexed budget 與 actual result進行比較,基于同樣的實際生產水平,去對比預計和實際之間的差異。
對于Flexible budget 主要考察計算題但是也會考查文字題,因此我們會對兩種題型進行總結。
二、Flexible budget-計算題
1,
注:
(1) 彈性預算是將成本按照成本性態進行區分,分為變動成本,固定成本和半變動成本,對于不同類別的成本有不同的計算方式
(2) 固定預算和彈性預算之間只存在數量間的差異,價格是一致的。固定預算下基于預計數量彈性預算下基于實際數量
(3) 對于固定費用本身特性是不會隨著數量的變化而變化的,所以固定預算和彈性預算下的固定費用是一致的,都是基于預算的固定成本。有時候題目會將固定成本以單位的形式迷惑大家,此時大家要注意,固定成本=預計的數量*預計的單位成本。
2, 計算流程
第一步:根據成本性態對于成本進行區分
由上面表格可以知道對于不同的成本會由不同的計算方式, 但是題目中有時不會直接明說以下成本是固定,變動還是半變動,所以第一步是根據這三類成本的特點對于要求的成本進行成本分類。
變動成本:單位成本保持不變,總成本隨著數量的變化而變化
固定成本:總成本不變,不隨這數量的變話而改變
半變動成本:由固定成本和變動成本組合而成,通常如果成本既不是變動成本也不是固定成本,那就是半變動成本。
第二步:對于分類完成的成本按照各自的計算方式進行計算。
例題一:基于不同的生產活動水平
Answer:
↓
D
解析:
第一步:成本分類
對于direct cost 是變動成本(MA中所有的直接成本都是變動成本),所以Direct material是變動成本
對于labour cost和production overhead總成本都在變化,所以不符合固定成本總量不變的特點,所以不是固定成本。
對于labour cost,在生產活動水平為80%時,1%所對應的單位成本=$2120/80%=$26.5/%;在生產活動水平為90%時,1%所對應的單位成本=$2160/90%=$24/%, labour cost不符合變動成本單價不變的特點也不是變動成本, 那么此時labour cost 為半變動成本。
同理對于production overhead在生產活動水平為80%時,1%所對應的單位成本=$4060/80%=$50.75/%;在生產活動水平為90%時,1%所對應的單位成本=$4080/90%=$45.33/%, production overhead也不是變動成本, 那么此時production overhead 為半變動成本。
第二步:計算
Direct material 的單價=2400/80%=$30/%, 所以在生產水平為83%時,total direct material cost=$30 per %*83%=$2490
對于labour cost和production overhead都是半變動成本,因此可以結合在一起計算。
假設y=a+bx,其中y是labour cost和production overhead的總成本,x是生產活動水平%,a是固定成本,b是1%的變動成本。
將已知數據帶入:
a+80%b=2120+4060
a+90%b=2160+4080
解得:a=5700,b=6
所以方程為:y=5700+6x
將83%帶入公式,labour cost和production overhead的總成本=$5700+$6 per %*83%=$6198
所以total production cost=2490+6198=$8688
來源:ACCA學習幫
在ACCA考試中,flexible budget是MA科目里每年都會出現的必考難點,同時這個知識點可能以大題或者小題的形式進行考察,今天,會計網就給大家詳解這個考點內容。
Q1、What are fixed budget,flexible budget and flexed budget
在flexible budget中我們學了三種預算: fixed budget, flexible budget and flexed budget
Fixed budget:A fixed budget is a budget which is normally set prior to the start of an accounting period, and which is not changed in response to changes in activity or cost.
(固定預算是在生產之前就決定的,是固定數值不會隨著生產活動水平的變化而變化,適合用于planning stage,為企業未來的生產提供指引)
Flexible budgets are budgets which, by recognizing different cost behaviour patterns, change as activity levels change.
(彈性預算是將成本按照成本性態進行區分,分為變動成本,固定成本和半變動成本,會隨著生產活動水平的變化而變化)
Flexed budget: [Adjusted for actual volume](是flexible budget中特殊的一種,基于實際生產活動下的彈性預算,但是在MA中flexible budget 和flexed budget 看作一致的,也就是flexed budget 也可以表示為基于實際數量下的預算)
注:
當彈性預算是基于任意生產活動水平時,適合用于planning stage,幫助企業了解在不同情況下會消耗的資源,在生產前進行資源配置。
當彈性預算是基于實際生產活動水平時,使用于control stage:在獲得了實際結果時,如果直接那fixed budget 與實際結果進行比較意義不大,因為此時既有銷售數量的不同,又有價格的不同,所以此時用flexed budget 與 actual result進行比較,基于同樣的實際生產水平,去對比預計和實際之間的差異。
對于Flexible budget 主要考察計算題但是也會考查文字題,因此我們會對兩種題型進行總結。
Q2、Flexible budget-計算題
1,
注:
(1) 彈性預算是將成本按照成本性態進行區分,分為變動成本,固定成本和半變動成本,對于不同類別的成本有不同的計算方式
(2) 固定預算和彈性預算之間只存在數量間的差異,價格是一致的。固定預算下基于預計數量彈性預算下基于實際數量
(3) 對于固定費用本身特性是不會隨著數量的變化而變化的,所以固定預算和彈性預算下的固定費用是一致的,都是基于預算的固定成本。有時候題目會將固定成本以單位的形式迷惑大家,此時大家要注意,固定成本=預計的數量*預計的單位成本。
2, 計算流程
第一步:根據成本性態對于成本進行區分
由上面表格可以知道對于不同的成本會由不同的計算方式, 但是題目中有時不會直接明說以下成本是固定,變動還是半變動,所以第一步是根據這三類成本的特點對于要求的成本進行成本分類。
變動成本:單位成本保持不變,總成本隨著數量的變化而變化
固定成本:總成本不變,不隨這數量的變話而改變
半變動成本:由固定成本和變動成本組合而成,通常如果成本既不是變動成本也不是固定成本,那就是半變動成本。
第二步:對于分類完成的成本按照各自的計算方式進行計算。
例題一:基于不同的生產活動水平
Answer:
↓
↓
↓
D
解析:
第一步:成本分類
對于direct cost 是變動成本(MA中所有的直接成本都是變動成本),所以Direct material是變動成本
對于labour cost和production overhead總成本都在變化,所以不符合固定成本總量不變的特點,所以不是固定成本。
對于labour cost,在生產活動水平為80%時,1%所對應的單位成本=$2120/80%=$26.5/%;在生產活動水平為90%時,1%所對應的單位成本=$2160/90%=$24/%, labour cost不符合變動成本單價不變的特點也不是變動成本, 那么此時labour cost 為半變動成本。
同理對于production overhead在生產活動水平為80%時,1%所對應的單位成本=$4060/80%=$50.75/%;在生產活動水平為90%時,1%所對應的單位成本=$4080/90%=$45.33/%, production overhead也不是變動成本, 那么此時production overhead 為半變動成本。
第二步:計算
Direct material 的單價=2400/80%=$30/%, 所以在生產水平為83%時,total direct material cost=$30 per %*83%=$2490
對于labour cost和production overhead都是半變動成本,因此可以結合在一起計算。
假設y=a+bx,其中y是labour cost和production overhead的總成本,x是生產活動水平%,a是固定成本,b是1%的變動成本。
將已知數據帶入:
a+80%b=2120+4060
a+90%b=2160+4080
解得:a=5700,b=6
所以方程為:y=5700+6x
將83%帶入公式,labour cost和production overhead的總成本=$5700+$6 per %*83%=$6198
所以total production cost=2490+6198=$8688
來源:ACCA學習幫
在ACCA考試里,flexible budget是MA科目中每年必考的核心知識點,很多考生在復習時對該考點比不太了解,對此會計網今天就跟大家進行解析。
Q1、What are fixed budget,flexible budget and flexed budget
在flexible budget中我們學了三種預算: fixed budget, flexible budget and flexed budget
Fixed budget:A fixed budget is a budget which is normally set prior to the start of an accounting period, and which is not changed in response to changes in activity or cost.
(固定預算是在生產之前就決定的,是固定數值不會隨著生產活動水平的變化而變化,適合用于planning stage,為企業未來的生產提供指引)
Flexible budgets are budgets which, by recognizing different cost behaviour patterns, change as activity levels change.
(彈性預算是將成本按照成本性態進行區分,分為變動成本,固定成本和半變動成本,會隨著生產活動水平的變化而變化)
Flexed budget: [Adjusted for actual volume](是flexible budget中特殊的一種,基于實際生產活動下的彈性預算,但是在MA中flexible budget 和flexed budget 看作一致的,也就是flexed budget 也可以表示為基于實際數量下的預算)
注:
當彈性預算是基于任意生產活動水平時,適合用于planning stage,幫助企業了解在不同情況下會消耗的資源,在生產前進行資源配置。
當彈性預算是基于實際生產活動水平時,使用于control stage:在獲得了實際結果時,如果直接那fixed budget 與實際結果進行比較意義不大,因為此時既有銷售數量的不同,又有價格的不同,所以此時用flexed budget 與 actual result進行比較,基于同樣的實際生產水平,去對比預計和實際之間的差異。
對于Flexible budget 主要考察計算題但是也會考查文字題,因此我們會對兩種題型進行總結。
Q2、Flexible budget-計算題
1,
注:
(1) 彈性預算是將成本按照成本性態進行區分,分為變動成本,固定成本和半變動成本,對于不同類別的成本有不同的計算方式
(2) 固定預算和彈性預算之間只存在數量間的差異,價格是一致的。固定預算下基于預計數量彈性預算下基于實際數量
(3) 對于固定費用本身特性是不會隨著數量的變化而變化的,所以固定預算和彈性預算下的固定費用是一致的,都是基于預算的固定成本。有時候題目會將固定成本以單位的形式迷惑大家,此時大家要注意,固定成本=預計的數量*預計的單位成本。
2, 計算流程
第一步:根據成本性態對于成本進行區分
由上面表格可以知道對于不同的成本會由不同的計算方式, 但是題目中有時不會直接明說以下成本是固定,變動還是半變動,所以第一步是根據這三類成本的特點對于要求的成本進行成本分類。
變動成本:單位成本保持不變,總成本隨著數量的變化而變化
固定成本:總成本不變,不隨這數量的變話而改變
半變動成本:由固定成本和變動成本組合而成,通常如果成本既不是變動成本也不是固定成本,那就是半變動成本。
第二步:對于分類完成的成本按照各自的計算方式進行計算。
例題一:基于不同的生產活動水平
Answer:D
解析:
第一步:成本分類
對于direct cost 是變動成本(MA中所有的直接成本都是變動成本),所以Direct material是變動成本
對于labour cost和production overhead總成本都在變化,所以不符合固定成本總量不變的特點,所以不是固定成本。
對于labour cost,在生產活動水平為80%時,1%所對應的單位成本=$2120/80%=$26.5/%;在生產活動水平為90%時,1%所對應的單位成本=$2160/90%=$24/%, labour cost不符合變動成本單價不變的特點也不是變動成本, 那么此時labour cost 為半變動成本。
同理對于production overhead在生產活動水平為80%時,1%所對應的單位成本=$4060/80%=$50.75/%;在生產活動水平為90%時,1%所對應的單位成本=$4080/90%=$45.33/%, production overhead也不是變動成本, 那么此時production overhead 為半變動成本。
第二步:計算
Direct material 的單價=2400/80%=$30/%, 所以在生產水平為83%時,total direct material cost=$30 per %*83%=$2490
對于labour cost和production overhead都是半變動成本,因此可以結合在一起計算。
假設y=a+bx,其中y是labour cost和production overhead的總成本,x是生產活動水平%,a是固定成本,b是1%的變動成本。
將已知數據帶入:
a+80%b=2120+4060
a+90%b=2160+4080
解得:a=5700,b=6
所以方程為:y=5700+6x
將83%帶入公式,labour cost和production overhead的總成本=$5700+$6 per %*83%=$6198
所以total production cost=2490+6198=$8688
來源:ACCA學習幫
在ACCA考試中,MA科目有一個必考點需要考生們注意的,它就是預算管理之Flexible Budget,從往年來看,無論是大題、小題都會涉及到這個考點內容,今天會計網就跟大家一一詳解。
Q1、What are fixed budget,flexible budget and flexed budget
在flexible budget中我們學了三種預算: fixed budget, flexible budget and flexed budget
Fixed budget:A fixed budget is a budget which is normally set prior to the start of an accounting period, and which is not changed in response to changes in activity or cost.
(固定預算是在生產之前就決定的,是固定數值不會隨著生產活動水平的變化而變化,適合用于planning stage,為企業未來的生產提供指引)
Flexible budgets are budgets which, by recognizing different cost behaviour patterns, change as activity levels change.
(彈性預算是將成本按照成本性態進行區分,分為變動成本,固定成本和半變動成本,會隨著生產活動水平的變化而變化)
Flexed budget: [Adjusted for actual volume](是flexible budget中特殊的一種,基于實際生產活動下的彈性預算,但是在MA中flexible budget 和flexed budget 看作一致的,也就是flexed budget 也可以表示為基于實際數量下的預算)
注:
當彈性預算是基于任意生產活動水平時,適合用于planning stage,幫助企業了解在不同情況下會消耗的資源,在生產前進行資源配置。
當彈性預算是基于實際生產活動水平時,使用于control stage:在獲得了實際結果時,如果直接那fixed budget 與實際結果進行比較意義不大,因為此時既有銷售數量的不同,又有價格的不同,所以此時用flexed budget 與 actual result進行比較,基于同樣的實際生產水平,去對比預計和實際之間的差異。
對于Flexible budget 主要考察計算題但是也會考查文字題,因此我們會對兩種題型進行總結。
Q2、Flexible budget-計算題
1,
注:
(1) 彈性預算是將成本按照成本性態進行區分,分為變動成本,固定成本和半變動成本,對于不同類別的成本有不同的計算方式
(2) 固定預算和彈性預算之間只存在數量間的差異,價格是一致的。固定預算下基于預計數量彈性預算下基于實際數量
(3) 對于固定費用本身特性是不會隨著數量的變化而變化的,所以固定預算和彈性預算下的固定費用是一致的,都是基于預算的固定成本。有時候題目會將固定成本以單位的形式迷惑大家,此時大家要注意,固定成本=預計的數量*預計的單位成本。
2, 計算流程
第一步:根據成本性態對于成本進行區分
由上面表格可以知道對于不同的成本會由不同的計算方式, 但是題目中有時不會直接明說以下成本是固定,變動還是半變動,所以第一步是根據這三類成本的特點對于要求的成本進行成本分類。
變動成本:單位成本保持不變,總成本隨著數量的變化而變化
固定成本:總成本不變,不隨這數量的變話而改變
半變動成本:由固定成本和變動成本組合而成,通常如果成本既不是變動成本也不是固定成本,那就是半變動成本。
第二步:對于分類完成的成本按照各自的計算方式進行計算。
例題一:基于不同的生產活動水平
Answer:D
解析:
第一步:成本分類
對于direct cost 是變動成本(MA中所有的直接成本都是變動成本),所以Direct material是變動成本
對于labour cost和production overhead總成本都在變化,所以不符合固定成本總量不變的特點,所以不是固定成本。
對于labour cost,在生產活動水平為80%時,1%所對應的單位成本=$2120/80%=$26.5/%;在生產活動水平為90%時,1%所對應的單位成本=$2160/90%=$24/%, labour cost不符合變動成本單價不變的特點也不是變動成本, 那么此時labour cost 為半變動成本。
同理對于production overhead在生產活動水平為80%時,1%所對應的單位成本=$4060/80%=$50.75/%;在生產活動水平為90%時,1%所對應的單位成本=$4080/90%=$45.33/%, production overhead也不是變動成本, 那么此時production overhead 為半變動成本。
第二步:計算
Direct material 的單價=2400/80%=$30/%, 所以在生產水平為83%時,total direct material cost=$30 per %*83%=$2490
對于labour cost和production overhead都是半變動成本,因此可以結合在一起計算。
假設y=a+bx,其中y是labour cost和production overhead的總成本,x是生產活動水平%,a是固定成本,b是1%的變動成本。
將已知數據帶入:
a+80%b=2120+4060
a+90%b=2160+4080
解得:a=5700,b=6
所以方程為:y=5700+6x
將83%帶入公式,labour cost和production overhead的總成本=$5700+$6 per %*83%=$6198
所以total production cost=2490+6198=$8688
來源:ACCA學習幫
ACCA考試科目一共有15門,其中F2為《管理會計》,這門科目的主要內容是關于管理會計體系的主要元素和管理會計的作用,其中涉及較多的知識點多且雜,如管理會計,管理信息,成本會計等,考試難點較多,F2《管理會計》重點難點資料,具體如下:
1.Target cost=target selling price–target profit=market price–desired profit margin.
2.cost gap=estimated cost–target cost.
3.TQM:
①preventing costs
②appraisal costs
③internal failure costs
④external failure cost
4.Alternative costing principle:
①ABC(activity based costing)
②Target costing
③Life cycle
④TQM
8.Time series:
①trend
②seasonal variation:⑴加法模型sum to zero;⑵乘法模型sum to 4
③cyclical variation
④random variation
9.pricipal budget factor關鍵預算因子:be limited the activities
10.budget purpose:
①communication
②coordination
③compel the plan
④motivative employees
⑤resource allocation
11.Budget committee的功能:①coordinated②administration
12.Budget:①function budget②master budget:1.P&L;2.B/S;3.Cash Flow
13.Fixed Budget:不是在于固不固定,而是基于一個業務量的考慮,financail expression.
Flexible Budget:包含了固定成本和變動成本,并且變動成本的變化是隨著業務量的變化而改變。
14.Flexible Budget的優點:
①recognize different cost behavior.
②improve quality and a comparison of like with like
③help managers to forecast cost,revenue and profit.
15.Flexible Budget的缺點:
①假設太簡單。
②需要更多的時間準備預算編制。
16.Controllable cost is a“cost which can be influenced by”its budget holder.大部分的變動成本是可控的,non-controllable cost為inflation.
17.Budget Behavior:
①participate approach
②imposed budget
18.payback投資回收期的缺點:
①ignore profitability
②the time value of money is ignored
③沒有考慮項目后期帶來的經濟利益
④arbitray武斷
19.payback投資回收期的優點:
①easy to calculate
②widely use
③minimize the effect of the risk and help liqidity
★如果在算投資回收期的時候,發生折舊,則需要加回折舊,因為折舊是非現金項目。
20.(1+real interst rate)*(1+inflation rate)=(1+nominal interest rate)
21.NPV=present value of future net cash flow–present value of initial cost
22.永續年金=A/i
23.每年的匯報是相同的就查看年金現值系數表,不同的就查看年金系數表。
24.EAR=CAR=APR=(1+r/n)n–1有效年利率
25.IRR:(based on cash flow analysis)
①IRR>cost of capital,NPV>0,worth taking
②IRR<cost of capital,NPV<0,not worthwhile.
26.ARR=average profit/average investment(ARR是基于profit)
Average investment=(initial investment–residual value)/2
27.type of standard:
①basic standard
②current standard
③ideal standard
④attainable standard
28.Variance
ⅠMaterial Variance
⑴total material variance=standard cost–actual cost
⑵material price variance=(standard price–actual price)*actual quantity
⑶material usage variance=(standard usage of actual output-actual usage)*standard price.
ⅡDirect Labor Variance
⑴standard pay–actual pay
⑵Labor rate variances=(standard rate–actual rate)*actual hrs of actual output
⑶Labor efficiency variances=(standard hrs of actual output–actual hrs)*standard rate
ⅢVariable production overhead variances
⑴Total variable O.H.variance=standard cost–actual cost
⑵Variable O.H.expenditure variance=(standard rate–actual rate)*actual hrs
⑶Variable O.H.efficiency variance=(standard hrs of actual output–actual hrs)*standard rate
ⅣFixed O.H.expenditure variance
⑴Fixed O.H.Expenditure variance=budget expenditure–actual expenditure
⑵Fixed O.H.volume=(actual output-budgeted volume)*standard hrs per unit*standard rate per hr.
⑶Capacity variance=(actual hrs worked–budgeted hrs worked)*standard rate per hr
⑷Efficiency variance=(standard hrs worked for actual output–actual hrs worked)*standard rate per hr⑴+⑵:Fixed O.H.total variance=fixed O.H.absorbed–actual expenditure
ⅤSales variance
⑴Sales price variances=(actual price–budget price)*actual sales units
⑵Sales volume variances=(actual sales units–budget sales units)*standard profit per unit
(absorption)
⑶Sales volume variances=(actual sales units–budget sales units)*standard CPU(marginal costing)
ⅥIdle time variances
Idle time variance=(expected idle time–actual idle time)*adjusted hr rate
29.The elements of a mission statement including:
①Purpose
②Strategy
③Policies and standards of behavior
④Values and culture
30.A critical success factor is a performance requirement that is fundamental to competitive success.
31.Profitability ratios
①Return on capital employed(ROCE)
=profit before interest and tax/(shareholders’funds+long-term liabilities)×100%
②Return on equity(ROE)=profit after tax/shareholders’funds×100%
③Asset turnover=sales/capital employed×100%
=sales/(shareholders’funds+long-term liabilities)×100%
④Profit margin=profit before interest and tax/sales×100%
Profit margin×asset turnover=ROCE
32.Debt and gearing ratios
①Debt-to-equity ratio=long-term liabilities/total equity×100%
②Interest cover=PBIT/Interest×100%
33.Liquidity ratios
①Current ratio=current assets/current liabilities
②Quick ratio(acid test ratio)=current assets minus inventory/current liabilities
34.Working capital ratios
①Inventory days=average inventory*365/cost of sales
②Receivables days=average trade receivables*365/sales
③Payables days=average trade payables*365/cost of sales(or purchases)
35.Non-financial performance measures
Non-financial performance measures are considered to be leading indicators of financial performance.
①Market share
②Innovation
③Growth
④Productivity
⑤Quality
⑥Social aspects
36.The balanced scorecard:
①financial perspective
②external perspective
③customer perspective
④learning and innovation perspective
37.Benchmarking:
①Internal benchmarking
②Competitive benchmarking
③Functional benchmarking
④Strategic benchmarking
38.Value analysis is a planned,scientific approach to cost reduction,which reviews the material composition of a product and the product's design so that modifications and improvements can be made which do not reduce the value of the product to the customer or user.
39.Four aspects of'value'should be considered:
①Cost value
②Exchange value
③Utility value
④Esteem value
40.ROI=PBIT/capital employed*100%
Widely used and accepted;As a relative measure it enables comparisons to be made with divisions or companies of different sizes.
41.RI=PBIT-Imputed interest*capital employed.
Possible to use different rates of interest for different types of assets;Cost of finance is being considered.
隨著2020年ACCA12月考季結束,很快又到了新一輪考試備考預習。在備考過程中,很多考生都對flexible budget預算管理知識點存在疑惑,尤其在做題方面,不知道如何進行解答。針對此情況,會計網接下來就跟大家關于預算管理知識點的考試題型。
01、Flexible budget-計算題
例題二:基于實際生產活動水平例題二:基于實際生產活動水平
The following statement shows information related to the production and sale of a product of Gaodun company.
Answer: $ 424750
解析:
本道題目根據成本性態直接明確了成本類別,所以同學們不需要再對于成本進行分類,但是當成本無法直接區分時,需要像上一個例題根據成本性態進行區分,然后再計算。
Net profit= sales-total variable cost-total fixed cost
此時計算的是 flexed budgeted net profit,所以基于實際數量
Sales=預計單價*實際數量=26.5*30500=$808250
Variable cost= 預計單價*實際數量=7*30500=$213500
對于fixed cost 大家要注意了,題目中顯示的是fixed cost的單價,但是根據固定成本的特點:
總價不變,不隨著數量的變化而變化, 那么此時無論是彈性預算還是固定預算都是基于budget fixed cost=budget volume * budget cost per unit=5*34000=$170000
flexed budgeted net profit=808250-213500-170000=$424750
02、Flexible budget-文字題
對于彈性預算的文字題,通常就是問以下情況適用于固定預算還是彈性預算。
這個其實就是對固定預算和彈性預算之間的差異,再進行選擇。固定預算和彈性預算之間只存在數量間的差異,價格是一致的,固定預算下基于預計數量,數量不發生變化,彈性預算下基于不同生產活動水平,數量發生變化。差異只有數量,那么我們可以圍繞數量從以下兩個角度去判斷:
1,數量是否時常變化:時常變化用彈性預算會更加精確,較為固定用固定預算即可。
比如:
a. 企業每個期間內數量會產生變化,那么此時用彈性預算會更加精確合適
b. 銷售部門要達成銷售目標,對銷售部門而言,銷售目標不能是動態變化的,是年初定死的目標,銷售人員才會朝著這個固定的目標努力,所以此時fixed budget 更合適。
c. 公司的主預算(master budget),master budget 是整個公司根據各部門的預算進行溝通和匯總得來的,是基于整個公司的主預算,包含了資產負債表,利潤表和現金流量表。一般在一個經營周期內是不會改變的,所以用固定預算更為合適。
2,數量對于總成本的影響程度:
Total cost=total variable cost+total fixed cost, 對于變動成本會受數量的影響,總變動成本隨著數量的變化而變化;對于固定成本不受數量的影響。
所以當變動成本占總成本比例較大時,數量的變化對于總成本的影響較大,此時用彈性預算更合理。
當固定成本占比較大時,數量的變化對于總成本的影響較小,固定預算和彈性預算下的成本都是一致的,此時用固定預算即可。
03、Summary
以上是關于flexible budget的相關內容,在考試中如果不出大題考試分值為4分左右,如果出大題考試總分值在10-12分左右。
因此大家重點要掌握彈性預算下的計算流程,以及彈性預算和固定預算的適用性。
來源:ACCA學習幫
在ACCA考試中,F2科目里Production overhead比較多知識點需要考生掌握理解的,接下來會計網就跟大家講解Production overhead T account + 會計分錄考點內容。
Q:對于Production overhead究竟需要掌握哪些知識點,掌握到什么程度?
A:大家需要掌握3部分的內容:
1) Production overhead T account 借方有哪些交易?
2) Production overhead T account 貸方有哪些交易?
3) Production overhead T account多吸少吸的表現,及對利潤表的印象
1、Production overhead T account 借方有哪些交易?
2、Production overhead T account 貸方有哪些交易?
3、Production overhead T account多吸少吸的表達,及對利潤表的印象
4、習題帶練
題目給出的是Over/under absorbed overhead 的T 字賬戶,
我們發現P/L在T字賬戶右邊,對應黃色文字的分錄,所以可以判斷出under absorbed 4000
我們可以寫如下會計分錄
Dr Over/Under absorbed $ 4000
Cr Production oh $ 4000
Dr P/L $ 4000
Cr Over/Under absorbed $ 4000
所以選項D說over absorbed是錯的。
又因為$ 4000對應的是金額,所以選項C說labor hours were 4000是錯的。
選項A和B是相反意思,選擇其一即可。
由于是Under absorbed
則有Actual Production oh > Absorbed Production oh
Actual Production oh - Absorbed Production oh=Under absorbed=4000
題目已知Actual Production oh= Budget Production oh
替換上一行公式得到:Budget Production oh- Absorbed Production oh=4000
已知灰色公式
Absorbed production oh
=OAR*Actual activity level
Budget Production
=OAR* Budget activity level
提取公因式并二次替換公式得到:
OAR* (Budget activity level- Actual activity level)=4000
題目中已知OAR=$5 per labor hour
代入得到Budget activity level- Actual activity level=800 labor hours
這里的activity level就是labor hour
所以選擇A,Actual direct labor house were 800 less than budgeted
來源:ACCA學習幫
在ACCA考試中,預算一直作為一個高頻考點出現在PM(F5)科目試卷里,并且不少同學都會在這個考點上丟分,接下來,會計網就為大家著重詳解這個高頻考點內容,希望有所幫助。
在學習預算系統的時候,我們需要掌握的內容包含以下三點:① Steps of the budgeting system;② Applied conditions;③ Pros & Cons.
那么下面我們來看一下這兩個預算系統的具體內容吧~
Incremental budgeting
Steps
大家不需要把定義背出來,只需要記住下面這個公式然后看公式說話就行~
Previous/past data 土 = This year’s budget
An incremental budgeting is starting from the previous period’s budget or actual results and then adding or subtracting an incremental amount to get this year’s budget.
Applied conditions
Stable businesses; The current operations are effective,efficient and economic; Certain costs such as staff salaries.
Pros & Cons
Pros(萬精油):Quick and easy; Time saving.
Cons(重點掌握)
Builds on previous information; Encourage budget slack; Lack of business scrutiny.
Zero-based budgeting
Steps
Zero based budgeting requires each cost element to be specifically justified. The budget starts from zero and the activities are being undertaken for the first time.
Define the activities to be evaluated(decision packages——mutually exclusive & incremental)確定決策包;Evaluate and rank the activities評估和排序;Allocate resources分配資源。
大家別看這三個步驟只是簡單的幾個單詞,2015年6月份的真題就這個知識點考察了三分。
Applied conditions
Non-profit-making and service organizations; Discretionary cost占比較大的企業
Pros & Cons
Pros:Remove insufficient and obsolete operations; Increased staffs involved at all levels; Responds to changes in business environment.
Cons:Focuses on short term benefits; Requires high management skills; Time consuming; Ranking can be difficult.
這里列出的優缺點只是general的,在做題的時候還需要根據題目給出的具體情況來分析對于這家公司某種預算系統適用與否。
真題精講
聽了以上的講解,相信大家對于這兩種預算方法都有了更深入的了解,那么下面我們來看一道真題(2016 December)
Which TWO of the following statements regarding zero based budgeting are correct?
A. It is best applied to support expenses rather than to direct costs
B. It can link strategic goals to specific functional areas
C. It carries forward inefficiencies from previous budget periods
D. It is consistent with a top-down budgeting approach
答案:AB
解析:A:support expense屬于discretionary cost,ZBB不適用于生產制造型企業,A正確。B:ZBB是從0開始的,所有活動都當做是第一次發生,所以能夠把戰略目標跟具體的舉措聯系起來,B正確。C:描述的是incremental budgeting的特點。D:由于是從0開始,所以只有上級的投入不夠,需要各個等級工作人員的參與,因此D錯誤。
來源:ACCA學習幫
Accenture research shows that more than 70%business results will be influenced by outstanding finance function.Any enterprise doesn’t achieve the finance function transforming will definitely be threatened in nowadays fierce competition for lacking of decision support.As qualified finance executives,we should simplify the underlying business process,increase the time of decision-making support.Worldwide top companies have seized the opportunity to transform the finance function to achieve more effective financial work,then how about you?
This course invites Dr.Alan Parkinson,the well-known professor of University College London,to be the honorable lecturer on presenting the impacts of the changing world on finance function,and raising the response of finance function to the external influences.Alan will also guide the finance executives to utilize‘DMAIC Principle’(Define,Measure,Analyze,Improve,and Control)for optimizing company’s finance process.This course will help companies create values from customers’perspective and implement effective financial reform for enhancing competitive advantages.
?Knowing current worldwide changes and their major influence on finance function
?Understanding the finance function solutions for coping the changes and the development tendency of finance accounting
?Learning‘DMAIC Principle’for optimizing the finance process
?Strengthening data mining and acknowledgement
?Building partnership between finance and management level
?Enhancing value creation from customers’perspective
CFO
Finance Director
Chief Accountant
Finance Manager
Finance/Accounting Personnel
Day 1 |
-The implications of a changing world for the Finance function -Tasks of Accountants -Changes in The Organisational World -Manual Workers vs Knowledge Workers -The Impact on the World of Accountants Finance in the Future -The Shift in Focus within Finance -Better Performance Through Better Finance Support -Finance and IT Interfaces -Changing Information Demands Improve the Finance process:Inputs into Outputs -‘Business Partners’ -‘Lean’methodology -Undesirable effects(UDE’s) -Force field analysis Balanced scorecards -BSC KPIs -BSC Mechanisms -Practical Application -Advice For Successful Implementation -The Efficiency/Effectiveness Matrix Key performance indicators -Measuring Efficiency,Effectiveness,Economy -The 3Es&VFM -Holistic Measures -The Efficiency/Effectiveness Matrix |
Day 2 |
USING BUDGETS TO MANAGE AND PLAN:Beyond Conventional Budgeting -STRATEGIC CORPORATE PLAN -Budget Relationships(based on commercial business) -Traditional Budgeting -Playing Games with the Budget -The Hockey Stick -Influencing behaviorthrough responsibility accounting -The Utility of Budgets From‘Old’to‘New’Budgeting -Alternative Business Structures -Six Principles of Devolved Leadership -Unsuitability of Budgets -Six Adaptive Processes Thoughts about costs -Another Way of Looking at Costs -Full Costing -Contribution Costing‘Contribution Significance’in Your Area -Activity Based Costing and Illustration -Cost Pools Variances from Budgets -Making Sense of Budget Variances -Investigating Variances |
想了解詳細課程資料,點擊網頁左側的在線咨詢圖標,與在線老師交流。
在ACCA考試中,PM一向都是比較難的學科,當中有很多內容讓考生們難以理解,下面會計網列舉了兩道關于PM考試真題,并進行知識點的講解。
真題訓練1
答案:A 解析:題目問的是,調整了那些不在管理層控制范圍之內的因素之后,下列哪些方面仍然是業績做的不好的,換句話就是以下哪些variance,在operational 角度是adverse的。Operational variance要用revised 和 actual 比較。
1) Sales volume
Actual:300
Revised:看調整項,比去年下降25%,也就是400*(1-25%)=300,Actual=revised,不算好也不算壞。
2) Sales revenue
Actual: $28,500
Revised revenue=revised sales volume*revised sales price
銷量即使修訂過后和actual 也是一樣的,還是300,銷售價格根據Note,會下降10%。那么根據誰下降呢?注意,一般revised項都是基于original budget 去調整的(除非像1里面說跟去年比較怎么樣了,否則都默認和original budget比較)
Original Budget 的單價是$50,000/500=$100
100*(1-10%)=$90
因此revised revenue=300*90=$27000
Revised revenue =$27000 所以是F 3 )material cost PM科目中當題目沒有刻意的說銷量和產量之間差異的時候,都默認產量=銷量 Actual material cost=$6500 Revised material cost=revised volume*revised material cost per unit Revised volume=300 revised material cost per unit根據note,下降5%。 Original budget material cost per unit=$10,000/500=$20 revised material cost per unit=$20*(1-5%)=$19 Revised material cost=300*19=$5700 Revised material cost=$5700>actual material cost=$6500 所以是A 小結:做此類題目一定要看清楚題目問的是哪個角度下面的差異,是planning 還是operational;以及牢記planning是拿original
和revised 比較,operational是拿revised和actual 比較。 真題2 答案:D 解析:這道題有兩種方法解答,一種計算法,一種分析法。 方法一 方法二 第一段話:生產19l的X,按標準要8l的A原材料和12l的B原材料,也就是誰20l原材料投入才能生產出來19l的產品,normal
loss=5%。 第二段話:A原材料 $20/l B原材料 $ 25/l 說明B更貴 九月份,生產出來1850個x,一共用了2000l的原材料。按照標準的話,應該是A800l B1200l,但是現在A用900l
B用了1100l,也就是說貴的原材料少用了,因此是F。 投入了2000l的原材料,按標準應該得到2000*(1-5%)=$1900 產出,但是實際得到1850l 所以生產效率比較低,因此是A。 小結:同學么們不僅要非常熟悉公式計算,也要學會從Mix
yield的原理角度出發。像這題的話,只是問A或者F,沒有問具體的數額,用分析法做更節約時間。 如果Mix variance是adverse,則代表:The more expensive material is consumed more
than expected;如果yield variance是adverse,則代表:Less output has been achieved than
expected。 來源:ACCA學習幫
在備考ACCA過程中,除了教材外,真題練習同樣是不可劃缺的環節之一,今天會計網為大家帶來關于PM(F5)科目兩道Variance的真題,看看大家對知識點掌握的如何。
Sept 2016 No.13
答案:A 解析:題目問的是,調整了那些不在管理層控制范圍之內的因素之后,下列哪些方面仍然是業績做的不好的,換句話就是以下哪些variance,在operational 角度是adverse的。Operational variance要用revised 和 actual 比較。
1) Sales volume
Actual:300
Revised:看調整項,比去年下降25%,也就是400*(1-25%)=300,Actual=revised,不算好也不算壞。
2) Sales revenue
Actual: $28,500
Revised revenue=revised sales volume*revised sales price
銷量即使修訂過后和actual 也是一樣的,還是300,銷售價格根據Note,會下降10%。那么根據誰下降呢?注意,一般revised項都是基于original budget 去調整的(除非像1里面說跟去年比較怎么樣了,否則都默認和original budget比較)
Original Budget 的單價是$50,000/500=$100
100*(1-10%)=$90
因此revised revenue=300*90=$27000
Revised revenue =$27000 所以是F 3 )material cost PM科目中當題目沒有刻意的說銷量和產量之間差異的時候,都默認產量=銷量 Actual material cost=$6500 Revised material cost=revised volume*revised material cost per unit Revised volume=300 revised material cost per unit根據note,下降5%。 Original budget material cost per unit=$10,000/500=$20 revised material cost per unit=$20*(1-5%)=$19 Revised material cost=300*19=$5700 Revised material cost=$5700>actual material cost=$6500 所以是A 小結:做此類題目一定要看清楚題目問的是哪個角度下面的差異,是planning 還是operational;以及牢記planning是拿original
和revised 比較,operational是拿revised和actual 比較。 Specimen 2016 No.5 答案:D 解析:這道題有兩種方法解答,一種計算法,一種分析法。 方法一 方法二 第一段話:生產19l的X,按標準要8l的A原材料和12l的B原材料,也就是誰20l原材料投入才能生產出來19l的產品,normal
loss=5%。 第二段話:A原材料 $20/l B原材料 $ 25/l 說明B更貴 九月份,生產出來1850個x,一共用了2000l的原材料。按照標準的話,應該是A800l B1200l,但是現在A用900l
B用了1100l,也就是說貴的原材料少用了,因此是F。 投入了2000l的原材料,按標準應該得到2000*(1-5%)=$1900 產出,但是實際得到1850l 所以生產效率比較低,因此是A。 小結:同學們不僅要非常熟悉公式計算,也要學會從Mix
yield的原理角度出發。像這題的話,只是問A或者F,沒有問具體的數額,用分析法做更節約時間。 如果Mix variance是adverse,則代表:The more expensive material is consumed more
than expected;如果yield variance是adverse,則代表:Less output has been achieved than
expected 來源:ACCA學習幫
2021年ACCA備考工作已經開始了,今天會計網帶大家一起來看PM科目兩道Variance的真題,大家先試試自己能不能做對,再看解析。下面一起來看看吧。
例題一
答案:A 解析:題目問的是,調整了那些不在管理層控制范圍之內的因素之后,下列哪些方面仍然是業績做的不好的,換句話就是以下哪些variance,在operational 角度是adverse的。Operational variance要用revised 和 actual 比較。
1) Sales volume
Actual:300
Revised:看調整項,比去年下降25%,也就是400*(1-25%)=300,Actual=revised,不算好也不算壞。
2) Sales revenue
Actual: $28,500
Revised revenue=revised sales volume*revised sales price
銷量即使修訂過后和actual 也是一樣的,還是300,銷售價格根據Note,會下降10%。那么根據誰下降呢?注意,一般revised項都是基于original budget 去調整的(除非像1里面說跟去年比較怎么樣了,否則都默認和original budget比較)
Original Budget 的單價是$50,000/500=$100
100*(1-10%)=$90
因此revised revenue=300*90=$27000
Revised revenue =$27000 所以是F 3 )material cost PM科目中當題目沒有刻意的說銷量和產量之間差異的時候,都默認產量=銷量 Actual material cost=$6500 Revised material cost=revised volume*revised material cost per unit Revised volume=300 revised material cost per unit根據note,下降5%。 Original budget material cost per unit=$10,000/500=$20 revised material cost per unit=$20*(1-5%)=$19 Revised material cost=300*19=$5700 Revised material cost=$5700>actual material cost=$6500 所以是A 小結:做此類題目一定要看清楚題目問的是哪個角度下面的差異,是planning 還是operational;以及牢記planning是拿original
和revised 比較,operational是拿revised和actual 比較。 例題二 答案:D 解析:這道題有兩種方法解答,一種計算法,一種分析法。 方法一 方法二 第一段話:生產19l的X,按標準要8l的A原材料和12l的B原材料,也就是誰20l原材料投入才能生產出來19l的產品,normal
loss=5%。 第二段話:A原材料 $20/l B原材料 $ 25/l 說明B更貴 九月份,生產出來1850個x,一共用了2000l的原材料。按照標準的話,應該是A800l B1200l,但是現在A用900l
B用了1100l,也就是說貴的原材料少用了,因此是F。 投入了2000l的原材料,按標準應該得到2000*(1-5%)=$1900 產出,但是實際得到1850l 所以生產效率比較低,因此是A。 小結:考生們不僅要非常熟悉公式計算,也要學會從Mix
yield的原理角度出發。像這題的話,只是問A或者F,沒有問具體的數額,用分析法做更節約時間。 如果Mix variance是adverse,則代表:The more expensive material is consumed more
than expected;如果yield variance是adverse,則代表:Less output has been achieved than
expected 來源:ACCA學習幫
2021年ACCA6月考季即將到來了,在AB科目當中有一個比較難的知識點一直困擾著考生,那就是PSNCR、PSDR,為了幫助大家理解,會計網就跟各位詳解這些考點內容。
首先Taxation對政府來說是Revenue。假設今年的Taxation是100萬,收到了錢就要去辦事,比如說去修路,造福人民。預計的Public spending是150萬,這個時候大家就會發現收入小于支出,缺了50萬,因此政府就會出現Budget deficit預算赤字。那缺了50萬,相當于有些事情就沒有錢去處理了。那么就會出現政府的Publicborrowing,去借50萬。這50萬叫什么?叫做PSNCR,它的全稱是Public sector net cash requirement凈現金需求,曾用名:PSBR: public sector borrowing requirement公共部門借款需求。
結合經濟圈這個圖,此時出現的是Expansionary policy(擴張性財政政策)。
假設現在到了第二年。Taxation還是50萬,但是Public spending只需要40萬。這時候大家會發現收入是大于支出的,因此出現Budget surplus預算盈余。但是去年還欠錢,所以現在就要把去年欠的錢還上,因此會出現PSDR。
PSDR的全稱是Public Sector Debt Repayment公共部門債務償還。結合經濟圈這個圖,此時出現的是Deliberate policy /Contractionary policy(緊縮性的財政政策)。
所以最后我們得出一個等式PSNCR =PSBR = -PSDR。注意:這個不是看金額相等,而是指的正負號相等。
通過這個知識點的講解,相信大家已經對PSDR和PSNCR有了一定的了解了。再做到與這個知識點相關的題目,相信大家也有相應的思維脈絡了。
以上就是今天我們要講的內容,希望對大家有幫助。
來源:ACCA學習幫
馬上就快到2020年ACCA9月考季了,眾所周知,ACCA 教材里涉及的知識點特別多,要想提高學習效率必須要抓住重點內容去學。在以往的考試中,PM(F5)科目“增量預算和零基預算”一直都作為高頻考點頻繁出現在試卷中,為了提高大家學習效率,今天,會計網就跟大家講解一下增量預算和零基預算。
內容導航 | ACCA高頻考點 | ACCA證書領取 |
ACCA就業方向 | ACCA薪資待遇 |
在學習預算系統的時候,我們需要掌握的內容包含以下三點:① Steps of the budgeting system;② Applied conditions;③ Pros & Cons.
那么下面我們來看一下這兩個預算系統的具體內容吧~
Incremental budgeting
Steps
大家不需要把定義背出來,只需要記住下面這個公式然后看公式說話就行~
Previous/past data 土 △ = This year’s budget
An incremental budgeting is starting from the previous period’s budget or actual results and then adding or subtracting an incremental amount to get this year’s budget.
Applied conditions
Stable businesses; The current operations are effective,efficient and economic; Certain costs such as staff salaries.
Pros & Cons
Pros(萬精油):Quick and easy; Time saving.
Cons(重點掌握)
Builds on previous information; Encourage budget slack; Lack of business scrutiny.
Zero-based budgeting
Steps
Zero based budgeting requires each cost element to be specifically justified. The budget starts from zero and the activities are being undertaken for the first time.
Define the activities to be evaluated(decision packages——mutually exclusive & incremental)確定決策包;Evaluate and rank the activities評估和排序;Allocate resources分配資源。
大家別看這三個步驟只是簡單的幾個單詞,2015年6月份的真題就這個知識點考察了三分。
Applied conditions
Non-profit-making and service organizations; Discretionary cost占比較大的企業
Pros & Cons
Pros:Remove insufficient and obsolete operations; Increased staffs involved at all levels; Responds to changes in business environment.
Cons:Focuses on short term benefits; Requires high management skills; Time consuming; Ranking can be difficult.
這里列出的優缺點只是general的,在做題的時候還需要根據題目給出的具體情況來分析對于這家公司某種預算系統適用與否。
真題精講
聽了老師的講解,相信大家對于這兩種預算方法都有了更深入的了解,那么下面我們來看一道真題(2016 December)
Which TWO of the following statements regarding zero based budgeting are correct?
A. It is best applied to support expenses rather than to direct costs
B. It can link strategic goals to specific functional areas
C. It carries forward inefficiencies from previous budget periods
D. It is consistent with a top-down budgeting approach
答案:AB
解析:A:support expense屬于discretionary cost,ZBB不適用于生產制造型企業,A正確。B:ZBB是從0開始的,所有活動都當做是第一次發生,所以能夠把戰略目標跟具體的舉措聯系起來,B正確。C:描述的是incremental budgeting的特點。D:由于是從0開始,所以只有上級的投入不夠,需要各個等級工作人員的參與,因此D錯誤。
ACCA證書領取方法
首先,領取ACCA證書的前提,考生要必須學習完ACCA的全部課程,同時要通過ACCA各科目的考試、以及在線完成相關的學習和測試,還具備有三年以上的工作年限,才能真正取得證書。
關于證書領取的流程,考生需要登錄ACCA官網并下載填寫ACCA會員申請表,填寫完后需把表格遞交給ACCA總部,待總部審核通過后自然會頒發ACCA證書。時間消耗方面并不算很長,大概需要3個月左右時間就可以取得證書了。
ACCA機考考位該如何預約?
一般來說,在ACCA報名期間,考生就可以進行預約自己的機考考位了。為了不錯過時間,建議考生們最好在報名的時候,也跟考位一起進行預約,這樣就不會存在遺忘的問題了,要知道,一旦錯過了預約考位的時間,考生無法正常參加考試。
ACCA機考考位預約步驟
一般情況下,ACCA機考考位預約主要還是以官方網站預約為主,考生只需要登錄ACCA網站登錄自己的個人賬號,然后進入到報名頁面,根據系統的指示選擇考試科目以及繳納相應費用,就能夠預約完成了,操作步驟非常的簡單。
ACCA學員可以去哪里工作?
關于這點,其實大家不需要有任何擔憂,ACCA在國際領域一向都是高權威的考試,由于得到了全球企業的支持和認可,ACCA如今已經與全球眾多知名企業進行了一項免費的合作項目,對于已經通過ACCA考試的學員,可免費得到員工培訓發展、招聘等一系列的服務,就業方面并不成問題。
對于ACCA學員,出來工作的方向也存在比較多的選擇,像國內的四大銀行,中國工商銀行、中國農業銀行、中國銀行、中國建設銀行,交通銀行、匯豐銀行等。
像一些大型的跨國集團,中石化、保潔、阿里巴巴等,在金融財會領域中,像四大會計事務所,普華永道、畢馬威、德勤、安永"等都是ACCA學員可以選擇的就業方向,可以看出,ACCA的就業前景是非常廣闊的。
ACCA證書含金量高不高?
關于這點,從上述就可以知道,ACCA證書含金量是無可置疑的。自從ACCA進入了中國市場,在國際以及國內受企業的認可度就變得越來越高,由于ACCA人才在行業領域方面一直都是比較緊缺,為了吸引更多的人才,各企業所開出的薪資條件也變得越來越高。
其次,最為實用的一點是,參加ACCA考試,也是有效提升自我價值的一種表現,要知道,ACCA可是一項集各方面財會知識,設計范圍比較廣的高級課程考試,因此,對于持有ACCA證書的人士來說,你的能力也提升了不少,同樣在領導面前,你的能力也會得到看重和認可,這點自然也會成為你升職加薪的重要理由。
還有一點就是,通過學習ACCA的課程,讓你掌握了不少的專業上的知識,進一步拓展了自己的見識面,在與同事和領導交談時,也會有跟多的話題進行交流,從中也會學到很多不一樣的東西,為你以后的職業發展路帶來更好的幫助。
ACCA對出國有幫助嗎?
關于這個問題,答案當然是非常肯定的。只要考生能夠通過ACCA前9科的考試,并且能夠通過7500字論文的話,就能夠獲得英國牛津布魯克斯大學的應用會計的學士學位。
特別是對于一直想出國讀研考研的學生們,報考ACCA無疑是最佳的選擇,只要是你能夠順利的考取ACCA證書,意味著會為你以后的就業、薪資套上了一個光環,去到哪里都會閃閃發光,并會獲得眾人的一直贊譽。
ACCA薪資待遇好不好?
說到薪資待遇問題,ACCA的是無可置疑的。無論去到哪個國家也好,由于ACCA證書一直是比較高的含金量,而且各企業都非常認可這個證書,因此對于持有ACCA證書的就業人員來說,高薪高待遇是最基本的條件。
以國外地區為例,像英國美國這些國家,除了高薪資以外,對于ACCA的員工還會受到國家優惠的稅收政策等其它各式各樣的福利、津貼等。
其次,除了高薪資高福利補貼以外,像已經在工作的ACCA學員們在各企業都會有比較彈性、靈活的上班工作時間,而且在假期方面也是比其它行業員工會多很多,這點對于其它行業來說是無法做對比的。
PMP考試中有不少英文縮寫的專用名稱,為了方便考生更好地記憶考試知識點,這里將PMP常見的英文縮寫進行整理如下:
AC 實際成本 actual cost
ACWP 已完工作實際成本 Actual Cost for Work Performed
BAC 完工預算 budget at completion
CCB 變更控制委員會 change control board
COQ 質量成本 cost of quality
CPAF 成本加獎勵費用合同 cost plus award fee contracts
CPFF 成本加固定費用合同 cost plus fixed fee contract
CPI 成本績效指數 cost performance index
CPIF 成本加激勵費用合同 cost plus incentive fee contract
CPM 關鍵路徑法 critical path activity
CV 成本偏差 cost variance
EAC 完工估算 estimate at completion
EF 最早完成日期 early finish date
EMV 預期貨幣價值 expected monetary value
ES 最早開始日期 early start date
ETC 完工尚需估算 estimate to complete
EV 掙值 earned value
EVM 掙值管理 earned value management
FF 完成到完成 Finish-to-Finish
FFP 固定總價合同 Firm-Fixed-Price Contract
FMEA 失效模式與影響分析 Failure Mode and Effect Analysis
FP-EPA 總價加經濟價格調整合同 Fixed Price with Economic Price Adjustment Contracts
FPIF 總價加激勵費用合同 Fixed Price Incentive Fee Contract
FS 完成到開始 Finish-to-Start
IFB 投標邀請書 Invitation for Bid
LF 最晚完成日期 Late Finish Date
LOE 支持型活動 Level of Effort
LS 最晚開始日期 Late Start Date
OBS 組織分解結構 Organizational Breakdown Structure
PDM 緊前關系繪圖法 Precedence Diagramming Method
PMBOK 項目管理知識體系 Project Management Body of Knowledge
PV 計劃價值 Planned Value
QFD 質量功能展開 Quality Function Deployment
RACI 執行、負責、咨詢和知情矩陣 Responsible、Accountable、Consult、Inform Matirx
RAM 責任分配矩陣 Responsibility Assignment Matrix
RBS 風險分解結構 Risk Breakdown Structure
RFI 信息邀請書 Request for Information
RFP 建議邀請書 Request for Proposal
RFQ 報價邀請書 Request for Quotation
SF 開始到完成 Start-to-Finish
SOW 工作說明書 Statement of Work
SPI 進度績效指數 Schedule Performance Index
SS 開始到開始 Start-to-Start
SV 進度偏差 Schedule Variance
SWOT 優勢、劣勢、機會與威脅 Strengths,Weaknesses,Opportunities,Threats
T&M 工料 Time and Material
WBS 工作分解結構 Work Breakdown Structure
ACCA考試F2吸收成本法和邊際成本法的區別主要從利潤計算方法、標準成本法中的差異兩個方面看,具體內容如下:
利潤計算方法
①COS:按銷量計算,賣掉多少減多少。
吸收成本法下計入產品成本的只有total production cost(fixed production overhead&variable production overhead),當期銷售出去的存貨成本結轉到利潤表,即total production cost of sales;
邊際成本法下計入產品成本的只有total variable cost(variable production overhead&variable non-production overhead),當期銷售出去的存貨成本結轉到利潤表,即total variable cost of sales。
②Under/over absorption:吸收成本法特有的,邊際成本法不存在OAR和Under/over absorption。
涉及的計算公式:
Under/over absorption=Actual overhead-Absorbed overhead
Absorbed overhead=OAR*Actual activity level
OAR=Budget production overhead/Budget activity level
③Sales-COS:
吸收成本法下的主營業務收入-主營業務成本叫做Gross profit毛利潤;
邊際成本法下的主營業務收入-主營業務成本叫做Contribution貢獻。
④Period cost:當期發生多少減多少。
吸收成本法下包含total non-production cost;
邊際成本法下包含total fixed cost
⑤Valuation of closing inventory:Absorption costing>Marginal costing。
吸收成本法存貨計價:Direct material+Direct labour+Variable production overhead+Fixedproduction overhead;
邊際成本法存貨計價:Direct material+Direct labour+Variable production overhead;
標準成本法中的差異
①Cost variance---fixed production overhead variance
Absorption costing:
A.fixed production overhead total variance=under/over absorbed overhead
B.fixed production overhead expenditure variance=budgeted overhead-actual overhead
C.fixed production overhead volume variance=budgeted units*OAR-actual units*OAR
D.fixed production overhead volume efficiency variance=(budgeted hours at actual output-actual hours)*standard production overhead per hour
E.fixed production overhead variance=(budgeted hours-actual hours)*standard production overhead per hour
Marginal costing:(因為MC法下不存在OAR,所以對于fixed production overhead variance只有expenditure variance)
fixed production overhead expenditure variance=budgeted overhead-actual overhead
②Sales variance---sales volume variance
Absorption costing:sales volume profit variance=(budgeted units-actual units)*standardprofit per units
Marginal costing:sales volume profit variance=(budgeted units-actual units)*standardcontribution per units
③Operating statement
兩者的聯系
利潤差公式:MC+OAR*(closing inventory-opening inventory)=AC
注:1.此公式的利潤指兩種成本核算方法下的凈利潤,不是contribution和gross profit的比較;
2.Closing inventory-Opening inventory=Production units-Sales units
3.此公式可以用于求OAR=(AC-MC)/(closing inventory-opening inventory)
ACCA考試一共有15門科目,其中有一門為Management Accounting(MA),即《管理會計》,今天來解析一下該門科目里的吸收成本法和邊際成本法兩者的區別與聯系。
利潤計算方法
①COS:按銷量計算,賣掉多少減多少。
吸收成本法下計入產品成本的只有total production cost(fixed production overhead&variable production overhead),當期銷售出去的存貨成本結轉到利潤表,即total production cost of sales;
邊際成本法下計入產品成本的只有total variable cost(variable production overhead&variable non-production overhead),當期銷售出去的存貨成本結轉到利潤表,即total variable cost of sales。
②Under/over absorption:吸收成本法特有的,邊際成本法不存在OAR和Under/over absorption。
涉及的計算公式:
Under/over absorption=Actual overhead-Absorbed overhead
Absorbed overhead=OAR*Actual activity level
OAR=Budget production overhead/Budget activity level
③Sales-COS:
吸收成本法下的主營業務收入-主營業務成本叫做Gross profit毛利潤;
邊際成本法下的主營業務收入-主營業務成本叫做Contribution貢獻。
④Period cost:當期發生多少減多少。
吸收成本法下包含total non-production cost;
邊際成本法下包含total fixed cost
⑤Valuation of closing inventory:Absorption costing>Marginal costing。
吸收成本法存貨計價:Direct material+Direct labour+Variable production overhead+Fixedproduction overhead;
邊際成本法存貨計價:Direct material+Direct labour+Variable production overhead;
標準成本法中的差異
①Cost variance---fixed production overhead variance
Absorption costing:
A.fixed production overhead total variance=under/over absorbed overhead
B.fixed production overhead expenditure variance=budgeted overhead-actual overhead
C.fixed production overhead volume variance=budgeted units*OAR-actual units*OAR
D.fixed production overhead volume efficiency variance=(budgeted hours at actual output-actual hours)*standard production overhead per hour
E.fixed production overhead variance=(budgeted hours-actual hours)*standard production overhead per hour
Marginal costing:(因為MC法下不存在OAR,所以對于fixed production overhead variance只有expenditure variance)
fixed production overhead expenditure variance=budgeted overhead-actual overhead
②Sales variance---sales volume variance
Absorption costing:sales volume profit variance=(budgeted units-actual units)*standardprofit per units
Marginal costing:sales volume profit variance=(budgeted units-actual units)*standardcontribution per units
③Operating statement
03聯系
利潤差公式:MC+OAR*(closing inventory-opening inventory)=AC
注:1.此公式的利潤指兩種成本核算方法下的凈利潤,不是contribution和gross profit的比較;
2.Closing inventory-Opening inventory=Production units-Sales units
3.此公式可以用于求OAR=(AC-MC)/(closing inventory-opening inventory)
以上便是吸收成本法(Absorption costing)和邊際成本法(Marginal costing)之間的主要差異和聯系了,你記住了嗎?